In TECADE we are well aware of the current development of the offshore industry. For this reason we have recently opened TECADE YARD in the Port of Seville, a new riverside facility prepared to undertake projects related to the gas and oil segments, as well as the renewable energy sector.
These new facilities have great capacity and expansion potential, and are equipped with large covered assembly yards and uncovered storing areas.
The lifting cranes can be linked to operate in a coordinated and simultaneous manner in order to handle exceptionally large and heavy loads.
These facilities have direct access to the quay, which provides easy shipment of the manufactured structures. Thanks to the new lock, ships with the following maximum dimensions can enter the Port of Seville.
The harbour is a tidal-free basin, connected to the Guadalquivir River by a set of locks with the following characteristics:
- Length : 280 m
- Breadth : 39 m
- Draught: 11 m
The Draught in the river is 7 m ref. to at MLWS.
LOCATION
Address:
Tecade Yard – Puerto de Sevilla
Polígono Industrial Astilleros, Calle Pradas T1.
CP 41011 (Sevilla)