Arpeggio – Hisingsbron project (Sweden)
LOCATION: Gothenburg – Sweden TOTAL WEIGHT: 1600Tn SCOPE: Manufacture of the bridge for rail traffic (Kollektivtraffikbron), lifting span, steel columns for the board support and lifting pylons for the lift section YEAR: 2018-2020 Related news: The last section of the railway viaduct made by TECADE for the Hisingsbron bridge in Gothenburg are…
San Ignacio Bridge – Bilbao
CLIENT: Ferrovial – San Ignacio, Agroman, Viconsa LOCATION: Bilbao – Canal de Deusto SCOPE: Detailed engineering, manufacturing, quality control, supply, surface treatment, transport and assembly on site TOTAL WEIGHT: 470 Tn YEAR: 2020 Related news: https://tecade.eu/tecade-culmina-el-proceso-de-montaje-del-puente-de-san-ignacio-en-bilbao/
Steel viaduct on the Railway Line Bobadilla – Algeciras
CLIENT: AZVI Group LOCATION: Bobadilla (Málaga) TOTAL WEIGHT: 140 Tn YEAR: 2019 More information: https://tecade.eu/en/linea-ferroviaria-bobadilla-algeciras/
Construction of the Murcia ring road MU-30
CLIENT: UTE: COMSA, Constructora San José, Vías y Construcciones LOCATION: Murcia TOTAL WEIGHT: 370 Tn YEAR: 2018 – 2019
Connection structure E3 between SE-40 and A-4 (Dos Hermanas)
CLIENT: Construcciones Adolfo Sobrino S.A ( OHL Group) LOCATION: Dos Hermanas – Seville TOTAL WEIGHT: 204 Tn YEAR: 2018
A92 VIADUCT
CLIENT: Acciona Infraestructuras LOCATION: Archidona- Málaga TOTAL WEIGHT: 1.150Tn YEAR: 2014
IMPROVEMENTS ON M8, M73 AND M74 AT GLASGOW
CLIENT: Ferrovial Lagan LOCATION: Scotland – United Kingdom TOTAL WEIGHT: 3.654Tn YEAR: 2017
RIVER TERA VIADUCT
CLIENT: Acciona Infraestructuras LOCATION: Galicia – Spain TOTAL WEIGHT: 600Tn YEAR: 2013
CONSTITUTION OF 1812 BRIDGE – CADIZ
CLIENT: Dragados LOCATION: Cadiz – Andalucia – Spain TOTAL WEIGHT: 15.000Tn YEAR: 2015