Advances in the construction of San Ignacio Bridge in Bilbao
An important work on which we are immersed. It is located on the Deusto canal in Bilbao, with a high architectural value within the great regeneration project of the urban area of Zorrotzaurre.
It is a cable-stayed bridge (“Bow-String”) with a total length of 75m and a weight of 470 tons. Here some images of these advances: